Bonner Bridge engineer: Power outage didn’t impact our timeline Aug 18, 2017 | Bad Credit Loans, Bank Lending, Business Lending, Business Loans, Capital, Working Capital Weeks after a blackout caused what’s been described in lawsuits as a catastrophic hit to Outer Banks’ tourism, crews building the 2.5-mile Bonner Bridge want to move on.